Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 3 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

1

REVISION HISTORY

Rev Description

A

Original Issue

This document will be revised with any additions to or removals from LFS-SIS1 throughout

the operational lifecycle of the system.

2

INTRODUCTION

This document provides a procedure for shutdown condition functional proof testing to

ensure that the Safety Instrument System Life Cycle complies with the requirements of the

standard BS EN 61511.

BS EN 61511-1:2004 Clause 3.2.58 - Proof testing is a test performed to reveal undetected

faults in a safety instrumented system (SIS) so that, if necessary, the SIS can be restored to

its designed functionality.

By revealing all undetected faults, the PFD is effectively ‘reset’ back to the designed value.