Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 9 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

7

AS FOUND FUNCTIONAL PROOF TESTING PROCEDURE

7.1 Valve Performance As Found

Purpose of Test

To verify the correct undisturbed operation of FINAL ELEMENT valves as found prior to multiple operation

during SIF testing.

To verify correct DIAGNOSTICS information.

To verify correct Manual and Emergency Shutdown operation of FINAL ELEMENT valves.

If this test is not performed ‘as found’ undetected faults may not be revealed.

If valve target time is exceeded the tank could overfill following shutdown.

If valve target time is reduced the dockline could overpressure (surge) following shutdown.

Diagnostic information not displayed correctly could result in undetected tank overfill, system

unavailability or incorrect operational response.

Valves not operating correctly in manual or following Site ESD could initiate a tank overfill and

may not close if a demand is made on the overfill protection system.

Controlled Copy Documentation Required

LF364003_SCH - LFS-SIS1 Testing Matrix

Record all results on Sheet 2.

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

7.1.1

Review procedure with operations and

testing personnel.

All personnel familiarised with the scope

of works and responsibilities

.

Comment any issues in section 7.1.8 and

review / rectify prior to starting testing.

7.1.2

Confirm plant preparations satisfactory

prior to each period of work and

following changes in plant conditions or

operations.

Record PTW No………………………….

Conditions satisfied as detailed on PTW

and RAMS.

Comment any issues in section 7.1.8 and

review / rectify prior to starting any site

work.

7.1.3

Confirm system healthy and reset by

comparing against information on

LF364003_SCH Sheet 1.

System reset as detailed on

LF364003_SCH Sheet 1.

Comment differences from

LF364003_SCH or if found in tripped

state in section 7.1.8.

7.1.4

Open each valve under test.

Sections 7.1.4 to 7.1.7 to be completed for

each valve under test individually prior to

starting next valve.

Valve physical action found smooth with

full operation of valve stem.

Comment poor action / sticking in section

7.1.8.

Opening time – No specific requirement.

Comment times >115 seconds in section

7.1.8.

Correct FINAL ELEMENT valve position

and DIAGNOSTICS as detailed on

LF364003_SCH Sheet 2.

Comment differences from SCH in section

7.1.8.

Valve Performance As Found Continued on page 10