Local Fuel PLC – The Shoreham Oil Terminal
Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1
P & I Design Ltd
DOCUMENT NO: LF364012_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 20.05.15
Tel: + 44 (0)1642 617444
PAGE 12 OF 22
Fax: + 44 (0)1642 616447
www.pidesign.co.ukStep
Method of Test
Acceptance Criteria
Pass (
)
Fail (x)
Initial
7.2.6
Activate system associated Bund reset
and confirm valves enabled by opening
and closing.
System reset as detailed on
LF364003_SCH Sheet 1.
Comment differences from SCH in
section 7.2.7.
7.2.7
Comments/Defects/ Remedial Actions
– Report ALL to System Keeper
Tested by
Position
Qualification
Sign
Date
System Keeper Acknowledgement
(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate
terminal procedures for rectification works and/or isolation of plant as required)
Accepted by
Position
Qualification
Sign
Date