Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 14 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

7.3.5

Remove probe from tank and touch

end against tank top.

Valve action found smooth with full

operation of valve stem.

Comment poor action / sticking in

section 7.3.8.

Valve status ESD Tripped on Local

display.

Comment failure in section 7.3.8.

System trips closing and inhibiting from

reopening FINAL ELEMENT valves and

initiating DIAGNOSTICS as detailed on

LF364003_SCH Sheets 2 & 4.

Comment differences from SCH in

section 7.3.8

Time from test initiation to trip

activation <=2 seconds.

Comment failures in section 7.3.8.

XV Closing times for overfill and surge

protection with set limits as detailed on

LF364003_SCH Sheet 2.

Comment failures in section 7.3.8.

Record Physical Closing Time and

Physical Travel Time.

7.3.6

Confirm probe length correct and

inspection condition. Replace probe in

tank as found.

CRITICAL Step : Independent

confirmation required to verify probe

replaced in tank as found.

System remains tripped inhibiting from

reopening FINAL ELEMENT valves.

Independent verification to countersign

LF364003_SCH to confirm as found

replacement.

Comment failure in section 7.3.8.

7.3.7

Activate system associated Bund reset

and confirm valves enabled by

opening and closing.

System reset as detailed on

LF364003_SCH Sheet 1.

Comment differences from SCH in

section 7.3.8.

Drexelbrook Sensor As Found Physical test Functional Testing Continued on page 15