Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 10 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

7.1.5

Trip valve under test via simulation of

monitoring panel ESD by removing

fuse 24V/1. Note – This will close all

valves controlled via LFS-SIS1.

Valve physical action found smooth with

full operation of valve stem.

Comment poor action / sticking in

section 7.1.8.

Valve status ESD Tripped on Local

display.

Comment failure in section 7.1.8.

Closing times for overfill and surge

protection within set limits as detailed on

LF364003_SCH Sheet 2.

Comment failures in section 7.1.8.

Record Physical Closing Time and

Physical Travel Time.

Correct FINAL ELEMENT valve

position and DIAGNOSTICS as detailed

on LF364003_SCH Sheet 2.

Comment differences from SCH in

section 7.1.8.

7.1.6 Reopen valve.

System remains tripped inhibiting from

reopening FINAL ELEMENT valves.

Comment failure in section 7.1.8.

7.1.7 Replace fuse 24V/1.

FINAL ELEMENT valves remain

closed.

Comment failure in section 7.1.8.

7.1.8

Comments/Defects/ Remedial Actions

– Report ALL to System Keeper

Tested by

Position

Qualification

Sign

Date

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)

Accepted by

Position

Qualification

Sign

Date