Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 8 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

6.5

Confirm no visible signs of additional

plant or parallel systems which could

affect the SIS or invalidate testing.

No new additional plant equipment or

BPCS systems.

Comment any issues in section 6.6.and

review / rectify prior to starting

functional testing.

6.6

Comments/Defects/ Remedial Actions

– Report ALL to System Keeper

Tested by

Position

Qualification

Sign

Date

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)