Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 18 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

9

PREVENTATIVE MAINTENANCE

Purpose of Test

To complete any recommended preventative maintenance as required.

No specific preventative maintenance required, this section to be reviewed and expanded as

required.

Controlled Copy Documentation Required

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

9.1

9.2

Comments/Defects/ Remedial Actions

– Report ALL to System Keeper

Tested by

Position

Qualification

Sign

Date

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)

Accepted by

Position

Qualification

Sign

Date