Local Fuel PLC – The Shoreham Oil Terminal
Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1
P & I Design Ltd
DOCUMENT NO: LF364012_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 20.05.15
Tel: + 44 (0)1642 617444
PAGE 18 OF 22
Fax: + 44 (0)1642 616447
www.pidesign.co.uk9
PREVENTATIVE MAINTENANCE
Purpose of Test
To complete any recommended preventative maintenance as required.
No specific preventative maintenance required, this section to be reviewed and expanded as
required.
Controlled Copy Documentation Required
Step
Method of Test
Acceptance Criteria
Pass (
)
Fail (x)
Initial
9.1
9.2
Comments/Defects/ Remedial Actions
– Report ALL to System Keeper
Tested by
Position
Qualification
Sign
Date
System Keeper Acknowledgement
(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate
terminal procedures for rectification works and/or isolation of plant as required)
Accepted by
Position
Qualification
Sign
Date