Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 21 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

10.2 Emergency Shutdown As left

Purpose of Test

To verify the correct operation of the manual terminal Emergency Shutdown system as left following

multiple operation during SIF testing .

To verify correct DIAGNOSTICS information.

Controlled Copy Documentation Required

LF364003_SCH - LFS-SIS1 Testing Matrix

Record results on LF364003_SCH Sheet 2.

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

10.2.1

Review procedure with operations and

testing personnel.

All personnel familiarised with the scope

of works and responsibilities

.

Comment any issues in section 10.2.6

and review / rectify prior to starting

testing.

10.2.2

Confirm plant preparations satisfactory

prior to each period of work and

following changes in plant conditions or

operations.

Record PTW No………………………….

Conditions satisfied as detailed on PTW

and RAMS.

Comment any issues in section 10.2.6

and review / rectify prior to starting any

site work.

10.2.3

Confirm ESD system relays healthy and

reset.

ESD system relays reset as detailed on

LF364003_SCH Sheet 1.

Comment differences from

LF364003_SCH in section 10.2.6.

10.2.4

Initiate Terminal ESD

Comment activation method

…………………………………………..

ESD system relays de-energise as

detailed on LF364003_SCH Sheet 2.

Comment differences from

LF364003_SCH in section 10.2.6.

10.2.5

Reset Terminal ESD and confirm system

healthy and reset.

ESD system relays reset as detailed on

LF364003_SCH Sheet 1.

Comment differences from

LF364003_SCH in section 10.2.6.

10.2.6

Comments/Defects/ Remedial Actions

– Report ALL to System Keeper

Tested by

Position

Qualification

Sign

Date

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)

Accepted by

Position

Qualification

Sign

Date