Local Fuel PLC – The Shoreham Oil Terminal

Safety Instrument System Overfill Shutdown Conditions Proof Testing Procedure LFS-SIS1

P & I Design Ltd

DOCUMENT NO: LF364012_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 20.05.15

Tel: + 44 (0)1642 617444

PAGE 22 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

11

DOCUMENTATION & HANDOVER

Purpose of Test

To update the lifecycle documentation.

Handover System

Documentation Required

LF364013_RPT - LFS-SIS1 Operation, Maintenance and Modification Lifecycle

LF364004_SCH - LFS-SIS1 Testing Lifecycle Matrix

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

11.1

Review testing with system keeper.

System Keeper to sign all sections.

11.2

Update LF364013_RPT - LFS-SIS1

Operation, Maintenance and

Modification Lifecycle

Updated

11.3

Update LF364004_SCH - LFS-SIS1

Testing Lifecycle Matrix

Updated

11.4

Issue copy of testing documentation to

System Keeper

Issued

11.5

Handover system to Operations, sign

off PTW

System keeper sign off completed,

operations aware of system status.

11.6

Comments

Tested by

Position

Qualification

Sign

Date

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)

Accepted by

Position

Qualification

Sign

Date