Local Fuel – The Shoreham Oil Terminal
Gasoline Import - Safety Instrument System
P & I Design Ltd
DOCUMENT NO: LF364006_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: C DATE: 13.05.16
Tel: + 44 (0)1642 617444
PAGE 15 OF 23
Fax: + 44 (0)1642 616447
www.pidesign.co.ukTank 1
Maximum Capacity
2333 m
3
Level switch operation : 98.6% of tank capacity
2300 m
3
Capacity remaining in tank at point High High level activated
33 m
3
Process safety time (33m
3
/ 400m
3
/h)
5 mins
Tank 2
Maximum Capacity
1158 m
3
Level switch operation : 97% of tank capacity
1124 m
3
Capacity remaining in tank at point High High level activated
34 m
3
Process safety time (34m
3
/ 400m
3
/h)
5 mins
Tank 3
Maximum Capacity
1685 m
3
Level switch operation : 98% of tank capacity
1652 m
3
Capacity remaining in tank at point High High level activated
33 m
3
Process safety time (33m
3
/ 400m
3
/h)
5 mins
Tank 4
Maximum Capacity
2345 m
3
Level switch operation : 98.6% of tank capacity
2311 m
3
Capacity remaining in tank at point High High level activated
34 m
3
Process safety time (34m
3
/ 400m
3
/h)
5 mins
The above figures are based on the Local Fuel LOC sheet
The valve will therefore be set to close in a time > 80 secs for surge protection (90s±10%)
and < 2mins 30s to prevent overfill (process safety time / 2)
Rotork skilmatic, the actuator manufacturer, quote the following data based on an Sira IEC
61508 certificate for a SI2.1Q actuator:
λ
SU
= 1.83 x 10
-6
hours
λ
DU
= 2.66 x 10
-7
hours
PFd calculated is 1.17 x 10
-3
based on a mean time to repair of 24 hours and a proof test
interval of 12 months.
SFF calculated is 87%
Pekos, the proposed valve manufacturer, quote the following data based on an Exida IEC
61508 certificate.:
λs
= 1650 x 10
-9
hours
λ
DD
= 292 x 10
-9
hours
λ
DU
= 334 x 10
-9
hours
PFd calculated is 1.48 x 10
-3
based on a mean time to repair of 24 hours and a proof test
interval of 12 months.