Local Fuel – The Shoreham Oil Terminal

Gasoline Import - Safety Instrument System

P & I Design Ltd

DOCUMENT NO: LF364006_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C DATE: 13.05.16

Tel: + 44 (0)1642 617444

PAGE 15 OF 23

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Tank 1

Maximum Capacity

2333 m

3

Level switch operation : 98.6% of tank capacity

2300 m

3

Capacity remaining in tank at point High High level activated

33 m

3

Process safety time (33m

3

/ 400m

3

/h)

5 mins

Tank 2

Maximum Capacity

1158 m

3

Level switch operation : 97% of tank capacity

1124 m

3

Capacity remaining in tank at point High High level activated

34 m

3

Process safety time (34m

3

/ 400m

3

/h)

5 mins

Tank 3

Maximum Capacity

1685 m

3

Level switch operation : 98% of tank capacity

1652 m

3

Capacity remaining in tank at point High High level activated

33 m

3

Process safety time (33m

3

/ 400m

3

/h)

5 mins

Tank 4

Maximum Capacity

2345 m

3

Level switch operation : 98.6% of tank capacity

2311 m

3

Capacity remaining in tank at point High High level activated

34 m

3

Process safety time (34m

3

/ 400m

3

/h)

5 mins

The above figures are based on the Local Fuel LOC sheet

The valve will therefore be set to close in a time > 80 secs for surge protection (90s±10%)

and < 2mins 30s to prevent overfill (process safety time / 2)

Rotork skilmatic, the actuator manufacturer, quote the following data based on an Sira IEC

61508 certificate for a SI2.1Q actuator:

λ

SU

= 1.83 x 10

-6

hours

λ

DU

= 2.66 x 10

-7

hours

PFd calculated is 1.17 x 10

-3

based on a mean time to repair of 24 hours and a proof test

interval of 12 months.

SFF calculated is 87%

Pekos, the proposed valve manufacturer, quote the following data based on an Exida IEC

61508 certificate.:

λs

= 1650 x 10

-9

hours

λ

DD

= 292 x 10

-9

hours

λ

DU

= 334 x 10

-9

hours

PFd calculated is 1.48 x 10

-3

based on a mean time to repair of 24 hours and a proof test

interval of 12 months.