Simon Storage Ltd – Immingham East Terminal

Gasoline Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: SI057001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: G DATE: 29.06.12

Tel: + 44 (0)1642 617444

PAGE 3 OF 34

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

1

REVISION HISTORY

Rev Description

A

Original Issue

B

Revised following Client meeting 16/02/07

C

Actual SIL 2 IPL Data added

D

Environmental and Financial Scenarios added

E

Total LOPA rewrite following decision to store gasoline on the Immingham East

terminal and incorporating PSLG guidelines and C.A. comments on other Simon

Storage terminals.

F

Clients comments incorporated with various Typographical error corrections and

units added.

Page 4 - Simon Competence statements added

Section 3 modified

Section 4 modified

Page 13 - Individual risk modified as per client comments

Section 5.1.1 modified as per client comments

Section 5.1.2 modified as per client comments

Section 5.3.2 modified as per client comment

Section 5.3.8 modified as per client comment

G

Following FSA Stage 3

Section 2.2 Modified: “A mid-range SIL2 protection layer which would close

individual tank-side pipeline fail-safe actuated valves on initiation of that tank’s

high high level switch.”

Section 4.1 Modified: “It was considered that the number of people on-site should

be stated as typically up to 20-30 during the day.”

Section 4.1.3 Modified: “No tertiary containment is available. In the LOPA no

credit has been taken for the Environmental case, Scenario 3.”

Section 5.1.2 Modified: … the jetty line actuated import lines will not close on

activation the fire alarm. However, the actuated tank import valves will close.

(For tank 561 = 6931mm, time to overfill after high high level activated: 5.4

minutes)

(For tank 564 = 8662mm, time to overfill after high high level activated: 9.9

minutes)

(For tank 568 = 8662mm, time to overfill after high high level activated: 9.9

minutes)

Section 5.3.3 paragraph added: It is considered that this Protection Layer can be

used for all initiating events as all of the gasoline tanks are protected by individual

tank-side valves that will close on activation of the level switch on that particular

tank. Within the scope of this LOPA, a gross misrouting of gasoline into any other

tanks on the terminal has not been considered.”