Edition 47 23-331
Wheel Loaders
IntegratedToolcarriers
23
Bucket Selection
●
910M — Standard Lift
910M — Standard Lift
Bucket Fill Factor
kg/m3
1150 1225 1300 1375 1450 1525 1600 1675 1750 1751 1825 1900 1901 1902
lb/yd3 1938 2064 2191 2317 2443 2570 2696 2822 2949 2950 3075 3202 3203 3205
m3
yd3
General Purpose
Pin On
1.3
1.7
113% 113% 109% 104% 104% 104%
1.4
1.8
110% 105% 105%
101% 97% 97% 97%
1.6
2.1
110% 104%
99% 95%
1.8
2.4
114% 107%
101% 96%
1.9
2.5
114% 107%
101% 95%
IT
1.3
1.7
111% 111% 107% 102% 102% 102%
1.3
1.7
112% 111% 107% 103% 103% 103%
1.5
2.0
109% 104%
100% 95% 95%
1.6
2.1
113% 107%
102% 97%
1.7
2.2
112% 106%
100% 95%
ISO
1.3
1.7
114% 109% 109% 104%
100% 100% 100%
1.5
2.0
112% 107%
102% 97%
1.7
2.2
109% 103%
98%
Material density and fill factor are key variables when choosing the appropriate size of the bucket.The long floor and open throat design of the Performance
Series Buckets along with the aggressive rack angles of the Cat Optimized Z-bar Loader will demonstrate fill factors greater than 100% ISO rated. Refer to the
Fill Factors
table for expected fill factor per material density and
Bucket Selection
table for bucket sizing.
910M — Standard Lift
Fill Factors
Materials
Density
Fill %
Earth and rock
~ 1800 kg/m3
~ 3033 lb/yd
3
~ 115%
Sand & gravel
~ 1700 kg/m3
~ 2865 lb/yd
3
~ 115%
Aggregates
~ 1600 kg/m3
~ 2696 lb/yd
3
~ 105%
Bulk grains
~ 750 kg/m3
~ 1264 lb/yd
3
~ 100%
Woodchips
~ 500 kg/m3
~ 843 lb/yd
3
~ 100%