Edition 47 23-333
Wheel Loaders
IntegratedToolcarriers
23
Bucket Selection
●
914M — Standard Lift
914M — Standard Lift
Bucket Fill Factor
kg/m3
1450 1525 1600 1675 1750 1825 1900 1975 2050 2051 2125 2200 2201 2202
lb/yd3 2443 2570 2696 2822 2949 3075 3202 3328 3454 3456 3581 3707 3709 3710
m3
yd3
General Purpose
Pin On
1.3
1.7
112% 108% 104% 104%
100% 97% 97% 97%
1.4
1.8
113% 108% 104%
100% 97% 96%
1.6
2.1
112% 107%
102% 98%
1.8
2.4
103%
98%
1.9
2.5
97%
IT
1.3
1.7
115% 110% 106%
102% 102% 98% 95% 95% 95%
1.3
1.7
115% 110% 106% 102% 102%
99% 95% 95% 95%
1.5
2.0
112% 107% 102%
98% 94%
1.6
2.1
109% 104%
100% 95%
1.7
2.2
108% 102%
98%
ISO
1.3
1.7
112% 108% 104%
100% 100% 96%
1.5
2.0
115% 109% 104%
100% 96%
1.7
2.2
105%
100% 95%
Material density and fill factor are key variables when choosing the appropriate size of the bucket.The long floor and open throat design of the Performance
Series Buckets along with the aggressive rack angles of the Cat Optimized Z-bar Loader will demonstrate fill factors greater than 100% ISO rated. Refer to the
Fill Factors
table for expected fill factor per material density and
Bucket Selection
table for bucket sizing.
914M — Standard Lift
Fill Factors
Materials
Density
Fill %
Earth and rock
~ 1800 kg/m3
~ 3033 lb/yd
3
~ 115%
Sand & gravel
~ 1700 kg/m3
~ 2865 lb/yd
3
~ 115%
Aggregates
~ 1600 kg/m3
~ 2696 lb/yd
3
~ 105%
Bulk grains
~ 750 kg/m3
~ 1264 lb/yd
3
~ 100%
Woodchips
~ 500 kg/m3
~ 843 lb/yd
3
~ 100%