Background Image
Previous Page  23 / 112 Next Page
Basic version Information
Show Menu
Previous Page 23 / 112 Next Page
Page Background

corporatenews

Sikora has dedicated the newly built

technology centre at its headquarters in

Bremen-Mahndorf, Germany.

The new building with a total area of

2,500m

2

offers more space for research

and development, sales, marketing and

procurement on four floors.

“With the new building we did a

strategically important step into the

future,” said Harry Prunk, chairman of

Sikora AG.

“With the expansion we are able to

further extend our innovation activities.

We have more space for new employees

and offer a modern and comfortable

working atmosphere, in which creative

ideas can grow.”

He emphasised the new building was

a “significant milestone in the 38-year

history of the company.”

Sikora AG – Germany

Fax

: +49 421 489 0090

Email

:

sales@sikora.net

Website

:

www.sikora.net

Sikora has dedicated its new technology centre

New building dedicated

Take Up

for spools

dia 560 mm to

dia 800 mm

Payoff with

dancer accumulator

and double pivot

to pre-load

for spools

dia 560 mm to

dia 800 mm,

tension adjustment

by magnetic

particle brake or

hysteresis brake

Payoff Flyers and Winders

mobac GmbH

Bunsenstr. 1 • D-24145 Kiel

Phone +49 (0)431-65 0277

Fax +49 (0)431-65 0511

mobac@t-online.de

Flyer Payoff

to put in

bobbin hole

for spools

dia 500 mm to

dia 1250 mm

www.mobac.com

High Quality Products for Wire and Cable Industries

Flyer Payoff

with dancer

accumulator

for spools

dia 100 mm to

dia 300 mm

Spooler

for spools

dia 20 mm to

dia 100 mm,

with revolution

counter to preset

and automatic

stop,

operates with

single or double

spoolseat

Driven

Tangential

Payoff

with tension and

rpm control by

sensor and

frequency inverter

for single wire,

multiwire and flat

wire sections

for spools

up to dia 800 mm