Table of Contents Table of Contents
Previous Page  381 / 536 Next Page
Information
Show Menu
Previous Page 381 / 536 Next Page
Page Background

367

CYIL 7 ȍ2016Ȏ

DO THE EUROPEANS HAVE THE RIGHT TO GET INFORMATION ABOUT…

information in the evaluation documents. In 2012 it prepared a Mission Report

on the Integrated Nuclear Infrastructure Review, where it recommended to the

Belarusian Ministry of Emergency Situations and to the Department of Nuclear

and Radiation Safety that they “complete a statement/strategy of regulator policy

regarding availability of information to the public for the purpose of transparency

and building trust in the regulatory body and for the public’s perception of safety of

Belarus’s nuclear power programme.”

39

Furthermore, the IAEA prepared an extensive

report on the Nuclear Power Plant in Ostrovets according to the methodology called

INPRO. The experts stated that “The detailed assessment of the Belarus NES using

the INPRO methodology found some so-called gaps, i.e. not complete fulfilment

of INPRO criteria for certain issues […] Most of these gaps are data that were not

available to the assessor at the time the report was written”.

40

2.2 The Obligations in the Convention on Environmental Impact

Assessment in a Transboundary Context

Furthermore, the obligations to provide information about the construction of

a nuclear power plant are outlined in the Convention on Environmental Impact

Assessment in a Transboundary Context, signed in Espoo, Finland, in 1991 (hereinafter

– the Espoo Convention). This Convention obligates its member states to provide

information and the possibility to participate in the procedures of the environmental

impact assessment to another State having joined the Convention when the activity

listed in the Convention is likely to cause a significant adverse transboundary impact.

The provisions of the Convention obligate the State in which the activity is planned

to provide notification of such activity to all the states that could be affected by the

proposed activity.

41

Therefore the State of origin prepares the environmental impact

assessment report of the projected facility and has the duty to notify the possibly

affected states of such activity. As is outlined in the Convention, “For a proposed

activity listed in Appendix I that is likely to cause a significant adverse transboundary

impact, the Party of origin shall, for the purposes of ensuring adequate and effective

consultations under Article 5, notify any Party which it considers may be an affected

Party as early as possible and no later than when informing its own public about that

proposed activity.”

42

The content of the notification is outlined further – the notification should contain

the information on the planned activity, including any information that is available

39

International Atomic Energy Agency ‘Mission Report on the Integrated Nuclear Infrastructure Review

(INIR)’ (18 to 29 June 2012 Minsk, Republic of Belarus).

40

IAEA ‘INPRO Assessment of the Planned Nuclear Energy System of Belarus. A report of the

International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO)’ (VIENNA, 2013)

IAEA-TECDOC-1716 239.

41

Convention on Environmental Impact Assessment in a Transboundary Context (adopted 25 January

1991, entered into force 10 September 1997) 1989 UNTS 309 (Espoo Convention), Article 2, para 4.

42

Ibid

., Article 3.