HEALTH & SAFETY REPORT

2015

page 18

4.3.2 KPI-2 Verification Non-Compliance

The safety-critical parts of offshore installations are subject to a verification process to ensure they are suitable

for their intended purpose and remain in good condition and repair. Safety-critical parts of an installation include,

for example, fire and gas detection, emergency shutdown and temporary refuge. Verification is undertaken by

an independent competent person (ICP) and the findings are ranked as levels 1, 2 or 3 using common definitions,

as outlined in Figure 13 below, and reported to Oil & Gas UK on a quarterly basis. KPI-2 monitors and measures

non-compliances under levels 2 and 3, as they are the more significant findings.

Figure 13: Current Definitions – Verification Findings

5

Level

1

Performance standard satisfied, but an ICP may suggest an improvement to the system or may

request additional information to demonstrate compliance with a performance standard.

2

Single performance standard failure with no significant threat to the installation.

3

Fundamental weakness of the safety-critical element (SCE) assurance system that:

involves multiple failures of a performance standard(s) or

presents a significant threat to the integrity of the installation

Figure 14 illustrates the number of open Level 2 findings (unresolved findings) per installation since the scheme

started in 2008 to the end of 2014. The overall trend is one of improvement, notwithstanding a brief increase in the

second half of 2013 and quarter 2 2014. Even allowing for that short rise, the specialists who provide the data and

manage assurance and verification within duty holder companies believe risks continue to be adequately controlled.

Figure 14: Average Number of Open Level 2 Findings per Installation

and the Number of Installations Reported at the End of a Quarter

0

50

100

150

200

250

0

2

4

6

8

10

12

14

16

2008

Q1

2008

Q3

2009

Q1

2009

Q3

2010

Q1

2010

Q3

2011

Q1

2011

Q3

2012

Q1

2012

Q3

2013

Q1

2013

Q3

2014

Q1

2014

Q3

Number of Installations

Average Number of Open Level 2 Findings per Installation

Average Number of Open Findings

Number of Installations

Source: Oil & Gas UK

5

Level 1 performance is tracked by duty holders but is not part of the industry KPI scheme.