MONITORING THE CAPACITY

ALLOCATION MECHANISMS

NETWORK CODE (CAM NC)

CAM NC was developed by ENTSOG and is

based on the Framework Guidelines given in the

Capacity Allocation Mechanisms from ACER

2011–2012.

CAM NC was approved by the EU Gas Commit-

tee on 14 October 2013 as Commission Regula-

tion (EU) No 984/2013.

The implementation date of CAM NC is 1 No-

vember 2015 with the exception of Article 6,

which is to be implemented by 4 February 2015.

Monitoring Article 6 of CAM NC

The aim of Article 6 is to increase the amount of

bundled capacity made available to network us-

ers at interconnection points (IPs). This is

achieved by maximising the technical capacity

while accounting for system integrity, safety and

efficient network operation. To achieve this

objective, adjacent TSOs shall develop a joint

mechanism that describes the specific actions

to be taken. Priority shall be given to IPs where

contractual congestions can be identified.

According to Article 19 of CAM NC, TSOs shall

primarily offer bundled capacity products to the

market. This obligation enters into force on

1 November, 2015. The commitments for TSOs

resulting from Article 6 can be seen as prepara-

tory tasks in order to achieve the highest bun-

dling of capacity possible.

Pursuant to Article 8 (8) of Regulation (EC) No

715/2009, ENTSOG monitors the implementa-

tion of CAM NC. ENTSOG launched the monitor-

ing process in December 2014 to ensure timely

publication of results in Annual Report 2014.

The aggregated results are shown below.

NUMBER

OF TSOS

METHOD FOR MAXIMISING

TECHNICAL CAPACITY

DEVELOPED

IN-DEPTH ANALYSIS OF TECH-

NICAL CAPACITIES ON BOTH

SIDES OF AN IP CARRIED OUT

FREQUENCY FOR

DYNAMIC RECALCULATION OF

TECHNICAL CAPACITY SET

ASSESSMENT OF PARAMETERS

AS DEFINED IN ART. 6, 1(B)

CAM NC MADE

COMMENTS

31

4

ongoing discussion with adjacent

TSOs regarding method +

its application

1

agreeing on joint method with

adjacent TSOs, but application

presumably not before Nov 1,

2015

1

Elaboration of the methodology

which shall be applied

10

exempted

Implemented  

In process of implementation (NRA decision pending)  

Not applicable, as regards scope, impl. date or derogation under Article 49 of Gas Directive  

Not implemented

Overview of Implementation status