MONITORING THE CAPACITY
ALLOCATION MECHANISMS
NETWORK CODE (CAM NC)
CAM NC was developed by ENTSOG and is
based on the Framework Guidelines given in the
Capacity Allocation Mechanisms from ACER
2011–2012.
CAM NC was approved by the EU Gas Commit-
tee on 14 October 2013 as Commission Regula-
tion (EU) No 984/2013.
The implementation date of CAM NC is 1 No-
vember 2015 with the exception of Article 6,
which is to be implemented by 4 February 2015.
Monitoring Article 6 of CAM NC
The aim of Article 6 is to increase the amount of
bundled capacity made available to network us-
ers at interconnection points (IPs). This is
achieved by maximising the technical capacity
while accounting for system integrity, safety and
efficient network operation. To achieve this
objective, adjacent TSOs shall develop a joint
mechanism that describes the specific actions
to be taken. Priority shall be given to IPs where
contractual congestions can be identified.
According to Article 19 of CAM NC, TSOs shall
primarily offer bundled capacity products to the
market. This obligation enters into force on
1 November, 2015. The commitments for TSOs
resulting from Article 6 can be seen as prepara-
tory tasks in order to achieve the highest bun-
dling of capacity possible.
Pursuant to Article 8 (8) of Regulation (EC) No
715/2009, ENTSOG monitors the implementa-
tion of CAM NC. ENTSOG launched the monitor-
ing process in December 2014 to ensure timely
publication of results in Annual Report 2014.
The aggregated results are shown below.
NUMBER
OF TSOS
METHOD FOR MAXIMISING
TECHNICAL CAPACITY
DEVELOPED
IN-DEPTH ANALYSIS OF TECH-
NICAL CAPACITIES ON BOTH
SIDES OF AN IP CARRIED OUT
FREQUENCY FOR
DYNAMIC RECALCULATION OF
TECHNICAL CAPACITY SET
ASSESSMENT OF PARAMETERS
AS DEFINED IN ART. 6, 1(B)
CAM NC MADE
COMMENTS
31
4
ongoing discussion with adjacent
TSOs regarding method +
its application
1
agreeing on joint method with
adjacent TSOs, but application
presumably not before Nov 1,
2015
1
Elaboration of the methodology
which shall be applied
10
exempted
Implemented
In process of implementation (NRA decision pending)
Not applicable, as regards scope, impl. date or derogation under Article 49 of Gas Directive
Not implemented
Overview of Implementation status