Simon Storage, Fluorobenzene Gantry / Tank 24

Instrument & Electrical Installation Tender Package

DOCUMENT REF: SI347001.INS

ISSUE: B DATE: 13.10.97

PAGE: 8 OF 23

2.8

Earthing

(Cont.)

2.8.4

Lightning Protection

Lightning protection is not anticipated for the plant.

2.9

Cabling

2.9.1

General

The schedules detail the cables with the estimated lengths for tendering purposes only. It is

the Installation contractors responsibility to site measure prior to any cable installation and

any cost variation must be advised to the Engineer for approval before installation.

All cables above 16 sq mm section shall have shaped conductors.

Before any armoured cable is installed, triplicate copies of the test certificate giving details

of these tests shall be submitted to the Engineer for approval.

When delivered to site, each coil of cable shall have attached the manufacturer's test

certificate.

When cables are steel wire armoured, the conductance of the armour shall be not less than

50% of the conductance of one phase core.

2.9.2

Installation

Bending radii shall conform to the maker's recommendations but in no case shall be less

than:

8 x OD for armoured cables.

Cables shall be identified with durable, non-corrodible tags, of the Critchley K type or

equivalent, inscribed with the reference number allocated in the cable schedules and fixed

securely to the cable.

All cables shall be tagged as follows:

a. At each termination.

b. Where they enter and leave underground ducts.

c. At each side of any barrier through which they run.

d. Where they rise from one level to another.

All cores shall be terminated using approved crimped lugs of appropriate size. Spare cores

shall be made off to unused terminals.

The cores of cables of section larger than 4mm² shall be connected by a means approved by

the Engineer.