9.5
All labels will be manufactured from Traffolyte with black lettering on a white
background, unless otherwise stated.
9.6
A label or terminal drawing shall be mounted in the enclosure detailing the fuse rating
together with circuit reference.
10.0
Inspection and Testing
10.1
P & I Design reserve the right to inspect or progress the equipment at any stage during
manufacture.
10.2
The panel manufacturer shall inspect the panel for the following:-
Conformity to standards.
Colour Coding and ferruling of all wiring.
Safe and easy access to equipment.
Earthing.
Labelling.
10.3
Once the above inspection by the manufacturer is complete, he shall then continuity check
all cabling. The panel manufacturer must not power up the panel until inspected by P & I
Design Ltd.
10.4
On completion of Section 10.3, P & I Design will inspect the panel and be present during
the time the panel is powered up.
10.5
P & I Design shall inform the manufacturer if functional testing will be carried out at the
manufacturers works or elsewhere.
If it is at the manufacturers works, then full simulated tests, including testing of inputs,
outputs, all instrumentation and shutdown logic will be performed by the manufacturer,
witnessed by P & I Design.
If the testing is not at the manufacturers works, then if P & I Design find any faults or
failings during testing, the manufacturer shall remedy the fault at the panel's location.