Tank Overfill Safety Instrument System

CompEx Rectification - Modification Sheet

P & I Design Ltd

DOCUMENT NO: PX232003_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 08.03.13

Tel: + 44 (0)1642 617444

PAGE 4 OF 5

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

3.3

Identified hazards affected

None.

3.4

Impact on functional safety

It is considered that there will be no impact on functional safety from this modification.

Note: If by performing this modification, there is an impact on functional safety, then the

impact must be analysed by returning to the first part of the safety system lifecycle

documentation and review the effect of this change, ensuring that the Safety Integrity Level

and other protection layers are adequate for functional safety.

3.5

Design of the modification

3.5.1 SIS Documentation impacted by the modification

SI297001_DWG

SI297003_DWG

SI297001_SCH

SI297007_RPT

3.6

Implementation plan

LEHHH03 to be replaced and retested when tank 3 back in service.

LEHHH04 to be replaced when tank 4 removed from service, retested when tank 4 back in

service.

JB3 to be added when tank 4 removed from service.

3.7

Testing plan

The Safety Instrument System Panel will require re-testing prior to and following the

modifications.