Tank Overfill Safety Instrument System

Modification Sheet

P & I Design Ltd

DOCUMENT NO: PX232001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 10.07.12

Tel: + 44 (0)1642 617444

PAGE 3 OF 5

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

1

REVISION HISTORY

Rev Description

A

Original Issue – Modification requested, assessed and initiated

B

C

D

2

SCOPE

This document has been prepared to control a modification to the Conoco Phillips, Bramhall

Terminal, Tank Overfill Safety Instrument System.

The modification is necessary due to a failure of a safety relay in the Safety Instrumented

System for tank 1

The purpose of this report is to ensure that the proposed modifications are planned,

reviewed and approved prior to implementation. Also to highlight the necessary changes to

all documentation.

A stage 5 Functional Safety Assessment would normally be initiated at this stage. However

as the replacement is a like for like replacement of a certified component, no stage 5 FSA is

considered necessary.

3

MODIFICATION PLAN

3.1

Description of the modification or change

The Pilz S2 relay in the Safety Instrumented system logic for tank 1 will be replaced with an

identical unit supplied by Pilz.

3.2

Reason for the modification or change

Tank 1 was out of service so before it was re-instated the Hi Hi Hi alarm was tested,

everything worked fine but the annuciator panel could not be reset.

The panel was checked l & all seemed to be ok, all relays were energised as they should be.

It would appear that R128 was energised & all the lights were correct but none of the

contacts had changed over.

The power was cycled a couple of times but this made no difference.

The relay was removed to test on the bench, this time it worked.

The relay was then put back & worked.

Due to the failure it was recommended that the relay be replaced and the faulty relay