Tank Overfill Safety Instrument System
Modification Sheet
P & I Design Ltd
DOCUMENT NO: PX232001_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 10.07.12
Tel: + 44 (0)1642 617444
PAGE 3 OF 5
Fax: + 44 (0)1642 616447
www.pidesign.co.uk1
REVISION HISTORY
Rev Description
A
Original Issue – Modification requested, assessed and initiated
B
C
D
2
SCOPE
This document has been prepared to control a modification to the Conoco Phillips, Bramhall
Terminal, Tank Overfill Safety Instrument System.
The modification is necessary due to a failure of a safety relay in the Safety Instrumented
System for tank 1
The purpose of this report is to ensure that the proposed modifications are planned,
reviewed and approved prior to implementation. Also to highlight the necessary changes to
all documentation.
A stage 5 Functional Safety Assessment would normally be initiated at this stage. However
as the replacement is a like for like replacement of a certified component, no stage 5 FSA is
considered necessary.
3
MODIFICATION PLAN
3.1
Description of the modification or change
The Pilz S2 relay in the Safety Instrumented system logic for tank 1 will be replaced with an
identical unit supplied by Pilz.
3.2
Reason for the modification or change
Tank 1 was out of service so before it was re-instated the Hi Hi Hi alarm was tested,
everything worked fine but the annuciator panel could not be reset.
The panel was checked l & all seemed to be ok, all relays were energised as they should be.
It would appear that R128 was energised & all the lights were correct but none of the
contacts had changed over.
The power was cycled a couple of times but this made no difference.
The relay was removed to test on the bench, this time it worked.
The relay was then put back & worked.
Due to the failure it was recommended that the relay be replaced and the faulty relay
returned to the manufacturer for evaluation and report.