Table of Contents Table of Contents
Previous Page  119 / 120 Next Page
Information
Show Menu
Previous Page 119 / 120 Next Page
Page Background

BEMIP Gas Regional Investment Plan 2017 |

119

Legal Disclaimer

The TSOs have prepared this GRIP based on information collected and compiled

from their internal sources, received from ENTSOG and from other sources. The

TSOs do not audit or verify the veracity or accuracy of any such information. The

content of the GRIP (hereinafter referred to as “Content”) is provided on an “as is”

basis. The TSOs as well as their directors, officers, employees or agents (hereinafter

referred to as “TSO Parties”) do not guarantee the accuracy, completeness or time-

liness of the Content. The TSO Parties are not responsible for any errors or omis-

sions, regardless of the cause, for the results obtained from the use of the Content.

In no event shall TSO Parties be liable to any party for any direct, indirect, inciden-

tal, exemplary, compensatory, punitive, special or consequential damages, costs,

expenses, legal fees, or losses, including, without limitation, lost income or lost

profits and opportunity costs, in connection with any use of the Content. All analy-

ses and forecasts are mere statements of opinion as of the date they are expressed

and not statements of facts or recommendations. When making decisions of any

nature, any party shall rely exclusively on its own information, forecast, skill, judg-

ment and experience and not on the Content.

Publisher:

ENTSOG

aisbl

Avenue de Cortenbergh 100

1000 Brussels, Belgium

Coordinator:

Gasum Oy

Co-Authors:

BEMIP GRIP working group members from Gasum Ltd (Finland),

Elering AS (Estonia), JSC Conexus Baltic Grid (Latvia), GAZ-SYSTEM S.A. (Poland),

Energinet.dk (Denmark), Swedegas AB (Sweden) and AB Amber Grid (Lithuania)

Design :

DreiDreizehn GmbH, Berlin |

www.313.de