Cement & Concrete

G

auteng Piling had to install

175 auger cast-in-situ piles

of varied diameters for the

foundation of a newapartment block

in Hatfield, Pretoria, which has been

earmarked for students at the Univer-

sity of Pretoria.

Studios @ Burnett, a multi-storey

apartment block, is being developed

by the Feenstra Group and Costa

Zervas Projects. The 4 300m² project

on the corner of Burnett and Grosve-

nor streets, Hatfield, is close to the

university.

The auger piles provided by

Gauteng Piling are formed by drilling

holes into the ground, placing steel

reinforcement and then filling with

concrete. In built-up residential areas

such as Hatfield, the drilling for auger

cast piles causeminimal disturbance.

Kobus Geyer, Site Manager

for Gauteng Piling, says that the

175 auger piles required for the

foundations varied in diameter. “For

example, we provided 1 x 300 mm

pile, 27 x 550 mm, 31 of 800 mm,

15 x 1,4 m and 9 x 1,5 m - 15 different

diameter piles were specified. The

rebar cages inserted into the piles

consequently were also extremely

varied in diameter: from 150 mm to

1,35 m. The average depth of the

piles was 10 m and the vertical load-

ings ranged between 200kN/m to

9 200kN/m. Gauteng Piling used

two rigs for the piling excavations: a

Williams LDH digger with 5,5t-m

torque, and - for maximum speed - a

Soilmec SR30 hydraulic drilling rig on

tracks, fitted with high-tech comput-

erised controls,” Geyer stated.

Steel reinforcement employed for

Student apartments

the piles ranged fromfour high tensile

strength steel rods, with 12mmdiam-

eter (4Y12), to 13 high tensile strength

rods with 32mm diameter (13Y32).

The spirals of mild steel were 8mm in

diameter with a 200 mm pitch.

The team included: the main con-

tractor: Tri-Star; architects, Boogert-

man + Partners; quantity survey-

ors: Del QS; civil and structural

engineers: DG Consulting Engi-

neers; and groundwork contractors:

Pentagon.

Turnkey Precast Concrete Plants for Modern Building Systems long line bed production: extruder & slipformer systems for walls, oors and foundations pallet, table & battery moulds for any kind of walls and oors wet cast mould systems for stairs, columns, beams and foundations tailor-made automated concrete batching plants with concrete feed systems and distributors ALL fromONE single source weiler engineers and technicians design, manufacture and install your turnkey tailor-made precast concrete plant. CONSULTATION, ENGINEERING & MACHINERY FORTHE PRECAST CONCRETE INDUSTRY weiler GmbH, Rheinstr. 40, 55435 Gau-Algesheim, Germany, Tel: +49 6725 9195 490, Fax: +49 6725 9195 491, info@weiler.net, www.weiler.net weiler. we are made in Germany. Concrete HARD facts for YOUR success strong and extremely durable shaped in nearly any design high factory made constant quality straight, accurately tting smooth, ready-to-paint based on natural raw materials fast erection, sti connections high re resistance earthquake and hurricane resistant for any construction application low cost mass housing individual villas town houses apartment blocks high-rise buildings commercial shopping centers schools & hospitals industrial hangars car parks BUILDEXPO NAIROBI KENIA 2-4 MAY 2015 BOOTH A111 TOTALLYCONCRETE JOHANNESBURG 11-13MAY2015 BOOTH318 MEET US AT: