Southern Corridor GRIP 2017–2026 |

69

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

GWh/d

IP Csanádpalota (HU > RO)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

20

10

60

50

30

40

Figure 5.29:

Csanádpalota: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Csanádpalota (HU > RO)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

20

10

60

50

30

40

Figure 5.30:

Csanádpalota: Flows and booked capacity

vs. technical capacity (daily)

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

GWh/d

IP Drávaszerdahely (HU > HR)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

50

40

30

20

10

90

80

60

70

Figure 5.31:

Dravaszerdahely: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Drávaszerdahely (HU > HR)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

50

40

30

20

10

90

80

60

70

Figure 5.32:

Dravaszerdahely: Flows and booked capacity

vs. technical capacity (daily)

Csanádpalota (FGSZ > Transgaz)

Bidirectional

Dravaszerdahely (FGSZ > Plinacro

) Unidirectional

This IP has been designed as bi-directional but presently offers capacity only in the direction

HU > HR at about 40% of design capacity. Subject to a pressure management agreement between

the two TSOs and an increased use of FGSZ CS the IP could operate at about 60% of design

capacity in both directions. The full bi-directional capacity will be made available after the

installation of a CS on the Croatian side.