64 |
Southern Corridor GRIP 2017–2026
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
25
20
15
5
10
30
GWh/d
IP Gorizia / Šempeter (IT > SI)
Figure 5.9:
Gorizia/Šempeter: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
IP Gorizia / Šempeter (IT > SI)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
25
20
15
5
10
30
Figure 5.10:
Gorizia/Šempeter: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
25
20
15
5
10
30
GWh/d
IP Gorizia / Šempeter (SI > IT)
Figure 5.11:
Gorizia/Šempeter: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
IP Gorizia / Šempeter (SI > IT)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
25
20
15
5
10
30
Figure 5.12:
Gorizia/Šempeter: Flows and booked capacity
vs. technical capacity (daily)
Gorizia/Šempeter (Snam Rete Gas > Plinovodi)
bidirectional
This IP has become bidirectional as of 1 January 2015. Before that date, capacity from Slovenia to Italy was
offered only at the Italian side (technical firm capacity of 47 GWh/d), but no flow in that direction was regis-
tered.
Gorizia/Šempeter (Plinovodi > Snam Rete Gas)
The technical firm and interruptible capacity offered at the Italian side of the IP is between 47GWh/d and
51GWh/d.