Southern Corridor GRIP 2017–2026

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

25

20

15

5

10

30

GWh/d

IP Gorizia / Šempeter (IT > SI)

Figure 5.9:

Gorizia/Šempeter: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Gorizia / Šempeter (IT > SI)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

25

20

15

5

10

30

Figure 5.10:

Gorizia/Šempeter: Flows and booked capacity

vs. technical capacity (daily)

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

25

20

15

5

10

30

GWh/d

IP Gorizia / Šempeter (SI > IT)

Figure 5.11:

Gorizia/Šempeter: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Gorizia / Šempeter (SI > IT)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

25

20

15

5

10

30

Figure 5.12:

Gorizia/Šempeter: Flows and booked capacity

vs. technical capacity (daily)

Gorizia/Šempeter (Snam Rete Gas > Plinovodi)

bidirectional

This IP has become bidirectional as of 1 January 2015. Before that date, capacity from Slovenia to Italy was

offered only at the Italian side (technical firm capacity of 47 GWh/d), but no flow in that direction was regis-

tered.

Gorizia/Šempeter (Plinovodi > Snam Rete Gas)

The technical firm and interruptible capacity offered at the Italian side of the IP is between 47GWh/d and

51GWh/d.