Southern Corridor GRIP 2017–2026 |

67

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

160,000

100,000

120,000

80,000

60,000

40,000

20,000

100,000

180,000

GWh/d

IP Mosonmagyaróvár (AT > HU)

Figure 5.21:

Mosonmagyaróvár: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Mosonmagyaróvár (AT > HU)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

160,000

100,000

120,000

80,000

60,000

40,000

20,000

100,000

180,000

Figure 5.22:

Mosonmagyaróvár: Flows and booked capacity

vs. technical capacity (daily)

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

GWh/d

IP Kulata / Sidirokastro (BG > GR)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

100

80

60

40

20

140

120

Figure 5.23:

Kulata/Sidirokastro: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Kulata / Sidirokastro (BG > GR)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

100

80

60

40

20

140

120

Figure 5.24:

Kulata/Sidirokastro: Flows and booked capacity

vs. technical capacity (daily)

Mosonmagyaróvár (Gas Connect Austria > FGSZ)

Unidirectional

From July 2014 to June 2015 the total booked capacity at the Hungarian side was

substantially higher (approximately 225GWh/d)

Kulata/Sidirokastro (Bulgartransgaz > DESFA)

Bidirectional

As in the previous GRIP report, this IP presents periods with flows and booked

capacities above the technical one which resulted from the application of the lesser

rule.

The booked capacity at the beginning of the reporting period shows reductions (at

the Sidirokastro side) due to announced reduced capacity periods caused by

maintenance works.