Southern Corridor GRIP 2017–2026 |
67
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
160,000
100,000
120,000
80,000
60,000
40,000
20,000
100,000
180,000
GWh/d
IP Mosonmagyaróvár (AT > HU)
Figure 5.21:
Mosonmagyaróvár: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
IP Mosonmagyaróvár (AT > HU)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
160,000
100,000
120,000
80,000
60,000
40,000
20,000
100,000
180,000
Figure 5.22:
Mosonmagyaróvár: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
GWh/d
IP Kulata / Sidirokastro (BG > GR)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
100
80
60
40
20
140
120
Figure 5.23:
Kulata/Sidirokastro: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
IP Kulata / Sidirokastro (BG > GR)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
100
80
60
40
20
140
120
Figure 5.24:
Kulata/Sidirokastro: Flows and booked capacity
vs. technical capacity (daily)
Mosonmagyaróvár (Gas Connect Austria > FGSZ)
Unidirectional
From July 2014 to June 2015 the total booked capacity at the Hungarian side was
substantially higher (approximately 225GWh/d)
Kulata/Sidirokastro (Bulgartransgaz > DESFA)
Bidirectional
As in the previous GRIP report, this IP presents periods with flows and booked
capacities above the technical one which resulted from the application of the lesser
rule.
The booked capacity at the beginning of the reporting period shows reductions (at
the Sidirokastro side) due to announced reduced capacity periods caused by
maintenance works.