Table of Contents Table of Contents
Previous Page  62 / 122 Next Page
Information
Show Menu
Previous Page 62 / 122 Next Page
Page Background

62 |

Southern Corridor GRIP 2017–2026

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

350

300

250

150

100

50

200

400

500

450

GWh/d

IP Oberkappel (AT > DE)

Figure 5.1:

Oberkappel: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

0

350

300

250

150

100

50

200

400

500

450

GWh/d

IP Oberkappel (AT > DE)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

Figure 5.2:

Oberkappel: Flows and booked capacity

vs. technical capacity (daily)

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

350

300

250

150

100

50

200

400

GWh/d

IP Oberkappel (AT > DE)

Figure 5.3:

Oberkappel: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

0

350

300

250

150

100

50

200

400

GWh/d

IP Oberkappel (AT > DE)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

Figure 5.4:

Oberkappel: Flows and booked capacity

vs. technical capacity (daily)

A. CROSS-BORDER IPS WITHIN EU

Oberkappel (GCA > GRT gaz Deutschland and Open Grid Europe)

bidirectional

Oberkappel (GRT gaz Deutschland and Open Grid Europe > Gas Connect Austria)

bidirectional