Southern Corridor GRIP 2017–2026
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
350
300
250
150
100
50
200
400
500
450
GWh/d
IP Oberkappel (AT > DE)
Figure 5.1:
Oberkappel: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
0
350
300
250
150
100
50
200
400
500
450
GWh/d
IP Oberkappel (AT > DE)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
Figure 5.2:
Oberkappel: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
350
300
250
150
100
50
200
400
GWh/d
IP Oberkappel (AT > DE)
Figure 5.3:
Oberkappel: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
0
350
300
250
150
100
50
200
400
GWh/d
IP Oberkappel (AT > DE)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
Figure 5.4:
Oberkappel: Flows and booked capacity
vs. technical capacity (daily)
A. CROSS-BORDER IPS WITHIN EU
Oberkappel (GCA > GRT gaz Deutschland and Open Grid Europe)
bidirectional
Oberkappel (GRT gaz Deutschland and Open Grid Europe > Gas Connect Austria)
bidirectional