Southern Corridor GRIP 2017–2026 |

63

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

GWh/d

IP Murfeld / Ceršak (AT > SI)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

80

60

40

20

160

140

100

120

Figure 5.5:

Murfeld/Ceršak: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Murfeld / Ceršak (AT > SI)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

80

60

40

20

160

140

100

120

Figure 5.6:

Murfeld/Ceršak

: Flows and booked capacity

vs. technical capacity (daily)

Average daily

Technical Capacity

Range

Booked non interruptible + interruptible Capacity

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

1,200

1,000

800

400

200

600

1,400

GWh/d

IP Arnoldstein (AT > IT)

Figure 5.7:

Tarvisio/Arnoldstein: Flows and booked capacity

vs. technical capacity (monthly)

Technical Capacity

Flow

Booked non interruptible + interruptible Capacity

Booked non interruptible Capacity

GWh/d

IP Arnoldstein (AT > IT)

Apr

2014

Jun

2014

Aug

2014

Oct

2014

Dec

2014

Feb

2015

Apr

2015

Jun

2015

Aug

2015

Oct

2015

Dec

2015

Feb

2016

0

1,200

1,000

800

400

200

600

1,400

Figure 5.8:

Tarvisio/Arnoldstein

: Flows and booked capacity

vs. technical capacity (daily)

Murfeld/Ceršak (Gas Connect Austria > Plinovodi)

unidirectional

Tarvisio/Arnoldstein (Trans Austria Gasleitung > Snam Rete Gas)

bidirectional

At the Interconnection point Exit Tarvisio/Entry Arnoldstein, physical reverse flow is

possible. In particular Trans Austria Gasleitung GmbH is offering as firm capacity

around 417GWh/d at the Austrian entry side and Snam Rete Gas is making available

around 194 GWh/d at the Italian exit side 

 2)

. Nevertheless, under the current

prevailing hub prices conditions, the activation of these flows is likely to be triggered

more by security of supply situations than by commercial reasons.

 2) For years 2016 and 2017 Snam Rete Gas capacity is offered as “Interruptible transportation capacity available with a

physical inlet flow or a physical flow equal to zero at the entry point of Passo Gries”. Starting from 2018 onward Snam

Rete Gas capacity will be offered as firm but competing with Passo Gries capacity (source: Snam Rete Gas Ten-Year

Network Development Plan 2016 – 2025).