Southern Corridor GRIP 2017–2026 |
63
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
GWh/d
IP Murfeld / Ceršak (AT > SI)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
80
60
40
20
160
140
100
120
Figure 5.5:
Murfeld/Ceršak: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
IP Murfeld / Ceršak (AT > SI)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
80
60
40
20
160
140
100
120
Figure 5.6:
Murfeld/Ceršak
: Flows and booked capacity
vs. technical capacity (daily)
Average daily
Technical Capacity
Range
Booked non interruptible + interruptible Capacity
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
1,200
1,000
800
400
200
600
1,400
GWh/d
IP Arnoldstein (AT > IT)
Figure 5.7:
Tarvisio/Arnoldstein: Flows and booked capacity
vs. technical capacity (monthly)
Technical Capacity
Flow
Booked non interruptible + interruptible Capacity
Booked non interruptible Capacity
GWh/d
IP Arnoldstein (AT > IT)
Apr
2014
Jun
2014
Aug
2014
Oct
2014
Dec
2014
Feb
2015
Apr
2015
Jun
2015
Aug
2015
Oct
2015
Dec
2015
Feb
2016
0
1,200
1,000
800
400
200
600
1,400
Figure 5.8:
Tarvisio/Arnoldstein
: Flows and booked capacity
vs. technical capacity (daily)
Murfeld/Ceršak (Gas Connect Austria > Plinovodi)
unidirectional
Tarvisio/Arnoldstein (Trans Austria Gasleitung > Snam Rete Gas)
bidirectional
At the Interconnection point Exit Tarvisio/Entry Arnoldstein, physical reverse flow is
possible. In particular Trans Austria Gasleitung GmbH is offering as firm capacity
around 417GWh/d at the Austrian entry side and Snam Rete Gas is making available
around 194 GWh/d at the Italian exit side
2)
. Nevertheless, under the current
prevailing hub prices conditions, the activation of these flows is likely to be triggered
more by security of supply situations than by commercial reasons.
2) For years 2016 and 2017 Snam Rete Gas capacity is offered as “Interruptible transportation capacity available with a
physical inlet flow or a physical flow equal to zero at the entry point of Passo Gries”. Starting from 2018 onward Snam
Rete Gas capacity will be offered as firm but competing with Passo Gries capacity (source: Snam Rete Gas Ten-Year
Network Development Plan 2016 – 2025).