Background Image
Table of Contents Table of Contents
Previous Page  45 / 150 Next Page
Information
Show Menu
Previous Page 45 / 150 Next Page
Page Background

Engineering

Division

Performance Measures

2014

Budget

2015

Budget

2016

Budget

2017

Budget

2018

Budget

2019

Land

Development

% of reduction in average land

development processing time on

engineering requirement for commercial

and industrial applications

13%

[Budget 10%]

5%

5%

5%

1%

1%

Realty Services

Expenses as a % of lease/rental revenues

41%

[Budget 48%]

47% 46% 45% 45% 45%

Operations

% of fleet winter ready, complete with

snow tires, by end of October

75%

[Budget 100%]

100% 100% 100% 100% 100%

% of reduction in missing information of

City infrastructure on GIS System

75%

[Budget 75%]

85% 95% 100% 100% 100%

Surrey City

Energy Utility

Connected Floor Area (m 2 )

N/A

37,625

79,532

218,130

377,154

454,424

Drainage Utility

% of City covered by an Integrated

Stormwater Management Plan (ISMP)

75%

100% 100% 100% 100% 100%

Parking

Authority Utility

Pay Station reliability – % of time

machines operating properly

90.5%

91% 91.5% 92% 92.5% 93%

Total # of managed parking spaces –

time/user restricted and pay parking

1,600

2,000

2,400

2,800

3,000

3,100

Sewer Utility

% of City’s video inspected

45%

51% 53% 55% 57% 59%

SolidWaste

Kitchen Waste Program total # of

residences to date

100,000

103,300

104,500

106,000

107,500

109,000

Solid waste diversion rate from disposal

70%*

70%*

72%*

75%*

75%*

75%

Transportation

Total # of marked pedestrian crossings

950

980

1010

1040

1070

1100

Total # of new high quality bus shelters

installed to date

250

[Budget 260]

261

276

291

307

322

Safer Schools Education and

Improvement Program (total #)

22

[Budget 16]

26

30

34

38

42

Total # of kilometers of cycling routes

(on-street and off-street)

520 km

[Budget 480 km]

535 km 550 km 565 km 580 km 595 km

Water Utility

% of single family homes on water

meters

63%

[Budget 60%]

68% 70% 73% 74%

75%

Average winter residential water

consumption (litres per capita per day)

284

[Budget 297]

288

286

284

282

280

*Budget restated from previous year to meet, in advance, the Metro Vancouver Regional Waste diversion goal of 70% by 2015.

36

Performance measures