DOCUMENTNO: SI483005_RPT

ISSUE: A DATE: 05.03.13

PAGE 12OF 19

P

&

I Design Lid

2 Reed Street, Thomaby,

UK, TSI7 7AF

Tel:

+

44 (0)1642 617444

Fax:

+

44 (0)1642 616447

www.pide

sign.co.uk

I.

ZS056101 Relay R299.

/

2.

ZSC56101 Relay R304.

../

3.

ZS056401 Relay R379.

./'

4.

ZSC56401 Relay R384.

../"

5.

ZS056801 Relay R459,

~

6.

ZSC5680I Relay R464.

/

Result

4.2.4.1

Simulate a volt free input to each limit switch relay

in

the system.

Incoming terminals linked relay energised, incoming terminals open circuit relay

de-energised.

4.2.4.2

Confirm BPCS status on outgoing terminals, outgoing terminals to

BPeS closed circuit

whilst relay energised,

open circuit

whilst relay de–

energised.

4.2.4.3

Remove and replace associated fuse for each limit switch, confirm relay

de-energised whilst removed.

4.2.4.4

Confirm limit switch status lamp illuminated whilst relay energised,

extinguished whilst relay de-energised.

confirm limit switch status lamp

illuminates whist lam test

ushbutton de ressed when rela de-ener ised.

4.2.4 VALVE FEEDBACK STATUS

Immingham Storage Co Ltd - Immingham East

Terminal

- No4 Switchroom Tank Overfill

Safety Instrument

System

Logic Panel

Factorv Acceptance TestProcedure