DOCUMENT NO: SI483005_RPT

ISSUE: A DATE: 05.03.13

PAGE 7 OF 19

P

&

I Design Ltd

2 Reed Street, Thornaby,

UK, TSI7 7AF

Tel:

+

44 (0) 1642617444

Fax:

+

44 (0)1642 616447

www.pidesign.co.uk

6.

5.

Termination and crimps tight.

4.

Fuse and

MeB

ratings conform to logic drawings.

3.

Panel wire gauge and colour conforms to panel specification.

2.

Panel wire feruling conforms to logic drawings.

~

1.

Terminals type and numbering conforms to logic drawings.

A random sample of the following tests to be carried out. During the

procedure of functional testing the controlled copies of listed logic drawings will

be used to record, by highlighting (yellow), satisfactory compliance with actions

I to 6.

On completion of all functional testing, all logic drawings should be fully

hi hli hted. Errors and omissions will be corrected and noted in red.

3.3

LOGIC PANEL WIRING INSPECTION

Immingham Storage Co Ltd _ Immingham East Terminal - N04 Switchroom Tank Overfill

Safety Instrument

System

Logic Panel

Factory Acceptance Test Procedure