DOCUMENT NO: SI483005 RPT
ISSUE: A DATE: 05.03.13 -
PAGE20F 19
P
&
I Design
LId
2 Reed Street, Thomaby,
UK, TS 17 7AF
Tel:
+
44 (0)1642 617444
Fax:
+
44 (0)1642 616447
www.oidesign.co.uk7.0
HAND OVER
AND LIFE CYCLE
~
19
6.0
ADDITIONAL TESTING
18
5.0
CHALLENGE TESTING
17
4
FUNCTIONAL TESTING
8
4.1
PANEL INFRASTRUCTURE
8
4.2
LOOP TESTING
o-o
,.
9
4.2.1 MANUAL SHUTDOWN - ESD
"
-
9
4.2.2 MANUAL SHUTDOWN - BUND ISOLATION PUSHBUTTONS
l0
4.2.3 SYSTEMTRIP RESET
,
,.."
11
4.2.4 VALVE FEEDBACK STATUS
12
4.2.5 HIGH LEVELS
13
4.2.6 BPCS VALVE COMMANDS
_
14
4.2.7 SAFETYRELAY
15
4.2.8 IMPORTVALVES
_
16
3.0
INSPECTION
5
3.1
EQUIPMENT CONFORMS TO INSTRUMENT SPECIFICATIONS
5
3.2
LOGIC PANEL CONSTRUCTION INSPECTION
6
3.3
LOGIC PANEL WIRING INSPECTION
7
2.0
DOCUMENTATION VERIFICATION
4
1..0
INTRODUCTION
3
Contents
Immingham Storage Co Ltd - Immingham East Terminal
- No4 Switchroom Tank Overfill
Safety Instrument
System
Logic Panel
Factory Acceptance Test Procedure