DOCUMENT NO: SI483005 RPT

ISSUE: A DATE: 05.03.13 -

PAGE20F 19

P

&

I Design

LId

2 Reed Street, Thomaby,

UK, TS 17 7AF

Tel:

+

44 (0)1642 617444

Fax:

+

44 (0)1642 616447

www.oidesign.co.uk

7.0

HAND OVER

AND LIFE CYCLE

~

19

6.0

ADDITIONAL TESTING

18

5.0

CHALLENGE TESTING

17

4

FUNCTIONAL TESTING

8

4.1

PANEL INFRASTRUCTURE

8

4.2

LOOP TESTING

o-o

,.

9

4.2.1 MANUAL SHUTDOWN - ESD

"

-

9

4.2.2 MANUAL SHUTDOWN - BUND ISOLATION PUSHBUTTONS

l0

4.2.3 SYSTEMTRIP RESET

,

,.."

11

4.2.4 VALVE FEEDBACK STATUS

12

4.2.5 HIGH LEVELS

13

4.2.6 BPCS VALVE COMMANDS

_

14

4.2.7 SAFETYRELAY

15

4.2.8 IMPORTVALVES

_

16

3.0

INSPECTION

5

3.1

EQUIPMENT CONFORMS TO INSTRUMENT SPECIFICATIONS

5

3.2

LOGIC PANEL CONSTRUCTION INSPECTION

6

3.3

LOGIC PANEL WIRING INSPECTION

7

2.0

DOCUMENTATION VERIFICATION

4

1..0

INTRODUCTION

3

Contents

Immingham Storage Co Ltd - Immingham East Terminal

- No4 Switchroom Tank Overfill

Safety Instrument

System

Logic Panel

Factory Acceptance Test Procedure