7.
Confirm power on load side ofMCB 5 when MCB 5 on, confirm no power
on load side when MCB 5 off.
MCB On .'
Vac
MCB Off.'
O'
Vac
6.
Confirm power on load side of MCB 4 when MCB 4 on, confirm no power
on load side when MCB 4 off.
5.
Confirm panel internal light illuminated when MCB 3 on,
confirm
extin uished when MCB 3 off.
MCB On
24:
Vdc
MCB Off
.Q
Vdc
3.
Confirm and record 24Vdc on all TB24V terminals to associated TBOV
terminal
when MCB lon,
confirm OVdc on all
TB24V terminals to
associated TBOVterminal when MCB 1 off.
ISO On .'
Vac
ISO Off
Q
Vac
2.
Select internal isolator to off position, establish ac power to logic panel.
Confirm no Vac at
MCB's, select internal isolator to on position, confirm
and record 240 Vac ower on all
MCB's.
I.
Initial setup, all
MCB's to the off position, all 24Vdc,
OVdcfuses and links
removed. Connect a suitably protected 240Vac supply to the panel isolator
incomin terminals.
Result
MCB Onm.a
Vac
MCB Off ... '
Vac
4.
Confirm socket energised when MCB 2 on, confirm de-energised when
MCB 2 off..
4.1
PANEL INFRASTRUCTURE
4
FUNCTIONAL TESTING
Immingham Storage Co Ltd _ Immingham East Terminal - No4 Switch room Tank Overfill
Safety Instrument
System
Logic Panel Factorv Acceptance Test
Procedure