8.

7.

Confirm power on load side ofMCB 5 when MCB 5 on, confirm no power

on load side when MCB 5 off.

MCB On .'

Vac

MCB Off.'

O'

Vac

6.

Confirm power on load side of MCB 4 when MCB 4 on, confirm no power

on load side when MCB 4 off.

5.

Confirm panel internal light illuminated when MCB 3 on,

confirm

extin uished when MCB 3 off.

MCB On

24:

Vdc

MCB Off

.Q

Vdc

3.

Confirm and record 24Vdc on all TB24V terminals to associated TBOV

terminal

when MCB lon,

confirm OVdc on all

TB24V terminals to

associated TBOVterminal when MCB 1 off.

ISO On .'

Vac

ISO Off

Q

Vac

2.

Select internal isolator to off position, establish ac power to logic panel.

Confirm no Vac at

MCB's, select internal isolator to on position, confirm

and record 240 Vac ower on all

MCB's.

I.

Initial setup, all

MCB's to the off position, all 24Vdc,

OVdcfuses and links

removed. Connect a suitably protected 240Vac supply to the panel isolator

incomin terminals.

Result

MCB Onm.a

Vac

MCB Off ... '

Vac

4.

Confirm socket energised when MCB 2 on, confirm de-energised when

MCB 2 off..

4.1

PANEL INFRASTRUCTURE

4

FUNCTIONAL TESTING

Immingham Storage Co Ltd _ Immingham East Terminal - No4 Switch room Tank Overfill

Safety Instrument

System

Logic Panel Factorv Acceptance Test

Procedure