![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0043.jpg)
PROJECT PROFILE
we have carefully measured and calcu-
lated the ecological impact of our choice
of materials, applied this concept to our
designs and prescribed methods to main-
tain our engineering interventions; gave
easy to understand and executable instruc-
tions on how to maintain the functionality
and protect its environmental impact
from our intervention, instigated the
process of keeping accurate records to
monitor and understand the engineering
interventions performance, rather than
back analysing why the system or structure
is failing in performance.
Perhaps then we can stand humbly to
accept the honour of good stewardship.
Mechanically stabilised earth wall
(MSEW), Terramesh, Green Terramesh
and Paraproducts (Hazyview slip repair
on road D1043, Mpumalanga).
Mechanically stabilised earth wall (MSEW), green Terramesh (Lamontville, KZN).