THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

Capabilities and Capacities – Facility 1

Dry-Dock Capability

Dry Dock 1

• 259.08 metres x 45.72 metres (entrance 44.2 metres)

• -5.6 metres CD (high water ordinary spring tides (HWOST) –

10.67 metres)

• Filling 1.5 hours

• Dewatering 2.5 hours

• Cranage:

- 2 x 100 tonnes at 43 metre radius

- 1 x 50 tonnes at 40 metre radius

• Serviced by two 100 tonne rail-mounted cranes, plus a 50 tonne

rail-mounted crane

• Sonar and floating, production, storage and offloading (FPSO) vessel

Spider pits

Dry Dock 7

• 151 metres x 20 metres

• 2.1 metres CD (MHWS – 7.1 metres)

Other e.g. Licences,

Permissions, Warehouse

and Storage Size,

Engineering, Electrical

and Joiners Workshop

Size

• Waste disposal licence

• Port security certification

• 24-hour security team onsite – full CCTV

• Onsite blasting and painting cells

• Machine shop – 1,235 m

2

• Pipe workshop – 850 m

2

• Onsite long-term agreement subcontractors for works such as

electrical, pipework, scaffolding, insulation, etc

• 21 metres length x 21 metres width x 25 metres height blast cell

• 21 metres length x 21 metres width x 25 metres height paint cell

• Certified ISO 9001 Quality Management System

• Certified ISO 14001 Environmental Management System

• FPAL accreditation

• Painting permit – Environment Agency

• Waste disposal handled by contractors

• Air draught restriction of +76.6 metres reference CD

>