Table of Contents Table of Contents
Previous Page  16 / 110 Next Page
Information
Show Menu
Previous Page 16 / 110 Next Page
Page Background

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

page 16

Capabilities and Capacities

(continued)

Cranage – Lifting Capacity

and Hook Height

(Tonnes and Metres)

Dockside and Jetty

• Duchy crane – 25 tonnes, hook height 22.9 metres/12 tonnes,

hook height 42.7 metres

• No 2 dock east – 48 tonnes, hook height 28.9 metres/15 tonnes,

hook height 47.5 metres

• No 3 dock east – 12 tonnes, hook height 14 metres/3 tonnes,

hook height 39 metres

• No 2 dock west – 10 tonnes, 18.9 metres/3.75 tonnes,

hook height 50 metres

• 3-4 docks – 60 tonnes, hook height 18.9 metres/19 tonnes,

hook height 50 metres

• No 2 dock west – 45 tonnes, hook height 31 metres/30 tonnes,

hook height 40 metres

Mobile cranes

• Iron fairy – 6 tonnes, hook height 2.4 metres

• Demag AC100 – 100 tonnes, hook height 3 metres 12.5 metres jib/

1.7 tonnes, hook height 46 metres 50.2 metres jib

• Liebherr 150 Litronic – 40 tonnes, hook height 16 metres/

13.7 tonnes, hook height 32 metres

Workshops and overhead gantry

• Engineering workshop – 1 x 40 tonnes, 1 x 15 tonnes, 2 x 10 tonnes

• Fabrication/plumbers workshop – 3 x 8 tonnes

• Electricians shop – 1 x 10 tonnes

• Cleaning shop – 1 x 3.2 tonnes

• Maintenance garage – 1 x 2 tonnes, 1 x 3 tonnes

• Paint shop – 1 x 3 tonnes

• Compressor house – 1 x 4 tonnes

• Wharf load-out – 50 tonnes/m

2

• <70 tonnes/m

2

selected areas wharf

Load-Out Capacity

(Tonnes)

Not provided

Minimum Water Depth

(Metres)

0.8 metres above chart datum (CD)

Maximum Water Depth

(Metres)

5.4 metres above CD mean high water springs