THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

page 90

Capabilities and Capacities – Tyneside

Total Area (m²)

325,000 m

2

Fabrication Area Covered

(m²)

16,500 m

2

Assembly and Erection

Area (m²)

104,000 m

2

Cranage – Lifting Capacity

and Hook Height

(Tonnes and Metres)

Internal Cranage Capability

A Shop Bay 1 – 1 x 50 tonne Apollo, 12.8 metres

A Shop Bay 2 – 3 x 40 tonne Morris, 12.8 metres

A Shop Bay 3 – 1 x 25 tonne Morris, 9 metres

2 x 15 tonne Morris

3 x 25 tonne Street

1 x 20 tonne Street

B Shop Bay 1 – 4 x 25 tonne Street, 9.9 metres

B Shop Bay 2 – 6 x 25 tonne NEI, 9 metres

B Shop Bay 3 – 1 x 50 tonne Demag, 11 metres

B Shop Bay 4 – 1 x 5 tonne Street, 11 metres

B Shop Bay 5 – 1 x Felco

B Shop Bay 6

B Shop Bay 7

Load-Out Capacity

(Tonnes)

Up to 13,000 tonnes self-propelled modular transporter trailer load-out

Minimum Water Depth

(Metres)

-5 metres lowest astronomical tide (LAT) at quay 1

-6.5 metres LAT at quay 2

Maximum Water Depth

(Metres)

11.5 metres (mean high water spring)

Dry-Dock Capability

Not applicable

Other e.g. Licences,

Permissions, Warehouse

and Storage Size,

Engineering, Electrical

and Joiners Workshop

Size, etc.

• Quay wall – 1,000 metres

• Warehousing and covered storage – 7,300 m

2

• Office area – 10,000 m

2

• Two fully equipped canteens

• No fixed limit load-out capacity; structures up to 13,000 tonne have

been loaded out

• Maintenance dredging licence, LAT -7 metres

• Main navigation channel of River Tyne at Hadrian Yard,

LAT -6 metres