![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0085.png)
page 85
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2016
Projects and Markets
Sheringham Shoal Substation Topsides
Client:
AREVA T&D Ltd
Contract:
Engineering, procurement and
construction (EPC)
Completion Date:
2010
Structure:
Two offshore wind substation topsides
Weight
Topsides:
806 tonnes and 803 tonnes
Size (Length x Width x Height)
Topside:
30.5 x 17.7 x 16 metres
Fabrication Tonnage
(Last Three Years)
14,000 tonnes
Fabrication Revenue/Turnover
(Last Three Years)
Not provided
Ability To Build Large Structures
Under Cover (Yes/No)
Yes
Current Market Areas
Oil, gas and renewable energy-related industries
Potential Market Areas
Not provided
>