Table of Contents Table of Contents
Previous Page  85 / 110 Next Page
Information
Show Menu
Previous Page 85 / 110 Next Page
Page Background

page 85

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

Projects and Markets

Sheringham Shoal Substation Topsides

Client:

AREVA T&D Ltd

Contract:

Engineering, procurement and

construction (EPC)

Completion Date:

2010

Structure:

Two offshore wind substation topsides

Weight

Topsides:

806 tonnes and 803 tonnes

Size (Length x Width x Height)

Topside:

30.5 x 17.7 x 16 metres

Fabrication Tonnage

(Last Three Years)

14,000 tonnes

Fabrication Revenue/Turnover

(Last Three Years)

Not provided

Ability To Build Large Structures

Under Cover (Yes/No)

Yes

Current Market Areas

Oil, gas and renewable energy-related industries

Potential Market Areas

Not provided

>