Table of Contents Table of Contents
Previous Page  82 / 110 Next Page
Information
Show Menu
Previous Page 82 / 110 Next Page
Page Background

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

page 82

Projects and Markets

Prior Experience/Projects

A selection of the type of projects the company has engaged

within the last five years are detailed below. Further details are

available upon request.

Culzean Development

Client:

Maersk Oil North Sea UK Ltd

Contract:

Procurement and construction

Completion

Date:

Ongoing – 2016

Structure:

Wellhead platform access deck and ways

Weight

Access Deck:

450 tonnes

Size

(Length x Width x Height)

Access Deck:

13 x 13 x 11 metres

Cygnus Project

Client:

GDF Suez E&P UK Ltd

Contract:

Fabrication contract

Completion

Date:

2015

Structure:

• 2 x wellhead platforms (1,400 tonnes

and 2,600 tonnes)

• 1 x process and utilities platform

(4,000 tonnes)

• 1 x compressionmodule (2,000 tonnes)

• 2 x bridges (350 tonnes)

• 1 x flare tower (100 tonnes)