Table of Contents Table of Contents
Previous Page  83 / 110 Next Page
Information
Show Menu
Previous Page 83 / 110 Next Page
Page Background

page 83

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

Projects and Markets

York Platform

Client:

Centrica Resources Ltd

Contract:

Engineering, procurement, construction and

installation (EPCI)

Completion

Date:

2012

Structure:

Production platform

Weight

Topside:

1,300 tonnes

Jacket:

1,450 tonnes

Piles:

1 x 59.9 tonnes, 1 x 62.4 tonnes,

3 x 169.4 tonnes, 3 x 169.6 tonnes

and 1 x 218.1 tonnes

Size

(Length x Width x Height)

Topside:

20 x 15 x 16 metres

Jacket:

30 x 20 x 69 metres

Piles:

1 x 34.8 metres, 1 x 36.3 metres,

3 x 51.1 metres, 1 x 66.1 metres

Andrew Process Platform

Client:

BP Exploration Operating Co. Ltd

Contract:

Fabrication contract

Completion

Date:

2012

Structure:

Wellhead platform and jacket

Weight

Topside:

750 tonnes

Size (Length x Width x Height)

Topside:

18 x 13 x 28 metres

>