Table of Contents Table of Contents
Previous Page  84 / 110 Next Page
Information
Show Menu
Previous Page 84 / 110 Next Page
Page Background

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

page 84

Projects and Markets

(continued)

Ensign Platform

Client:

Centrica Energy

Contract:

Engineering, procurement and construction

(EPC)

Completion

Date:

2011

Structure:

Wellhead platform and jacket

Weight

Topside:

500 tonnes

Jacket:

500 tonnes

Size

(Length x Width x Height)

Topside:

16 x 12 x 8.5 metres

Jacket:

20 x 20 x 48 metres

Buzzard Platform

Client:

Nexen Petroleum UK Ltd

Contract:

Fabrication contract (topside and bridges)

Completion Date:

2010

Structure:

Production sweetening topsides and

bridge

(Heerema Hartlepool)

Weight

Topside:

6,000 tonnes

Bridge:

500 tonnes

Size (Length x Width x Height)

Topside:

60 x 36 x 42 metres

Bridge:

50 metres