Inter Terminals

Immingham East

4 East Rail Loading

Gas Oil Marker System - URS

P & I Design Ltd

DOCUMENT NO: 16062RPT001

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: C

Tel: + 44 (0) 1642 617444

DATE: 20.07.16

Fax: + 44 (0) 1642 616447

PAGE: 2 OF 8

www.pidesign.co.uk

Contents

1 REVISION HISTORY.............................................................................................................3 2 INTRODUCTION ....................................................................................................................4 2.1 Existing System Overview .............................................................................................. 4 2.2 Proposed Marker Dye System Overview ......................................................................... 4 3 CONSTRAINTS .......................................................................................................................6 3.1 Availability ..................................................................................................................... 6 3.2 Simultaneous Loading..................................................................................................... 6 3.3 Manual Operation ........................................................................................................... 6 3.4 GOMC Metering............................................................................................................. 6 4 FUNCTIONAL REQUIREMENTS .......................................................................................7 4.1 Pumped Delivery System ................................................................................................ 7 4.2 Batch Control.................................................................................................................. 7 4.3 Ticket Printing ................................................................................................................ 8 4.4 Interlocks ........................................................................................................................ 8

Appendices

I

Inter Terminals sketch of proposed system

IME-K-0073 Rev.3 (red lined)

P2-25 #4 Rail Loading System P&I Diagram

References

IME-K-0073 Rev.3

P2-25 #4 Rail Loading System P&I Diagram

IME-K-0020 Rev.1

Arcton Hosepit P&I Diagram

GSP-7601

Marking of Hydrocarbon Oil and Control of Marking Operations

SI039001_MNL - P&I Design - 4 East rail loading design manual

SI760 - P&I Design project

4 East rail loading modifications

Mabanaft contract

HMRC Excise Notice 179: motor and heating fuels

general information and accounting for excise

duty and VAT