Table of Contents Table of Contents
Previous Page  2 / 118 Next Page
Information
Show Menu
Previous Page 2 / 118 Next Page
Page Background

Inter Terminals – Immingham East Terminal

4 East Rail Loading – GOMC Batching System

P & I Design Ltd

DOCUMENT NO: 16062MNL001

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE: 24.01.2017

Tel: 00 44 (0)1642 617444

Fax: 00 44 (0)1642 616447

www.pidesign.co.uk

Contents

1.

Registers

2.

User Requirement Specification

3.

Instrument Specifications

4.

Cable Overview & Cable Schedule

5.

General Arrangement Drawing

6.

Instrument / Electrical Drawings

7.

Pump Starter Drawings

8.

Operating Instructions

9.

Installation Scope of Work

10.

Testing & Handover