Previous Page  120-121 / 201 Next Page
Information
Show Menu
Previous Page 120-121 / 201 Next Page
Page Background

Table 7.3 Future Storage Requirements

Water System Master Plan

City of Morgan Hill

PRELIMINARY

Future Water Demands

Future Water Storage Requirements

Average Day

Demand

Maximum Day

Demand

Operational

at 25%

Emergency at

25%

Fire

Protection

Operational +

Emergency

Total, By

Pressure Zone

(MGD)

(MGD)

(MG)

(MG)

(MG)

(MG)

(MG)

Central Zones (Nob Hill and Boys Ranch Pressure Zones)

Nob Hill Zone

1

2.10

4.20

1.05

1.05

0.63

2.10

2.73

Boys Ranch Zone

0.85

1.70

0.42

0.42

0.63

0.85

1.48

Subtotal

2.95

5.90

1.48

1.48

1.26

2.95

4.21

West Side Pressure Zones

Llagas Zone

0.10

0.21

0.05

0.05

0.18

0.10

0.28

Woodland Zone

0.004

0.008

0.002

0.002

0.18

0.004

0.18

Glen Ayre Zone

0.003

0.007

0.002

0.002

0.18

0.003

0.18

El Toro Zone

2

0.02

0.05

0.01

0.01

0.18

0.02

0.20

Encino Zone

0.02

0.03

0.01

0.01

0.18

0.02

0.20

Subtotal

0.15

0.30

0.08

0.08

0.90

0.15

1.05

East Side Pressure Zones

Holiday Lake Zone

0.007

0.015

0.004

0.004

0.18

0.007

0.19

Holiday 1,2,3 Zones

0.21

0.42

0.11

0.11

0.18

0.21

0.39

Jackson Oaks Zone

0.02

0.04

0.01

0.01

0.18

0.02

0.20

Subtotal

0.24

0.48

0.12

0.12

0.54

0.24

0.78

Total Future Storage Requirements

3.34

6.68

1.67

1.67

2.70

3.34

6.04

Notes:

8/16/2017

1. Nob Hill Zone includes Easy Street Zone demands.

2. El Toro Zone includes Peak and Main Zone and Spring Hill Zone demands.

Pressure Zone