Table 7.6 Existing Pump Station Capacity Analysis

Water System Master Plan

City of Morgan Hill

PRELIMINARY

Pump Station Capacity Pump Station Capacity Analysis

Total

Firm Required Capacity

1

Deficiency

(ft)

(gpm)

(gpm)

(gpm)

(gpm)

Existing Pump Stations

East Dunne # 1

430

Nob Hill

Holiday Lake

1,800

1,200

446

-

East Dunne # 2

430

Nob Hill

Holiday Zone No. 1

400

200

135

-

East Dunne # 3

430

Nob Hill

Holiday Zone No. 2

925

425

73

-

El Toro

520

Peak and Main

El Toro Tank

380

190

2

-

Encino Booster

415

Nob Hill

Encino Tank

900

450

100

-

Glen Ayre Booster

660

Llagas

Glen Ayre Zone

330

165

41

-

Hydropneumatic Booster

1170

Jackson Oaks

Hydropneumatic Zone

1,710

1,640

1,538

-

Jackson Oaks Booster

830

Holiday Lake

Jackson Oaks Zone

970

620

315

-

Llagas Booster

365

Nob Hill

Llagas Zone

750

300

221

-

Peak and Main Booster

370

Nob Hill

Peak and Main Zone

2,050

1,350

226

-

Woodland Booster

620

Llagas

Woodland Zone

430

140

14

-

Note:

2/15/2017

1. Required firm pump station capacity equal to Maximum Day Demand. Required firm hydropneumatic pump station capacity also required to include 1,500 gpm fire flow.

Name

Elevation

Source Pressure

Zone

Destination Pressure Zone