Previous Page  134-135 / 201 Next Page
Information
Show Menu
Previous Page 134-135 / 201 Next Page
Page Background

Table 7.8 Proposed Pump Stations

Water System Master Plan

City of Morgan Hill

PRELIMINARY

Pump Station Capacity

Total

Firm

(ft)

(gpm)

(gpm)

(gpm)

(gpm)

(gpm)

New Pump Stations

East Dunne

1,2

430

Nob Hill

Holiday Zone

No. 1

2,700

1,800

3

Duty

900

Duty

900

Standby

900

Holiday Lake

2

780

Holiday Zone

No. 1

Holiday Lake

2,200

1,650

4

Duty

550

Duty

550

Duty

550

Standby

550

Notes:

2/15/2017

1. East Dunne Pump Station to replace existing East Dunne Pump Stations 1, 2, and 3.

2. Future capacity of East Dunne and Holiday Lake pump stations consistent with "Holiday Lake Zone Improvements" prepared by Akel Engineering Group July 2015.

Name

Elevation

Source Pressure

Zone

Destination

Pressure Zone

Design

Capacity

Pump

Status

No. of

Pumps