June 2017
7-26
City of Morgan Hill
Water System Master Plan
RP-7:
Replace the existing 6-inch pipeline with a new 6-inch pipeline in First Street
between Monterey Road and Depot Street.
RP-8:
Replace the existing 8-inch pipeline with a new 8-inch pipeline from the Jackson
Oaks hydropneumatic tank and Jackson Oaks Drive.