Previous Page  139 / 201 Next Page
Information
Show Menu
Previous Page 139 / 201 Next Page
Page Background

June 2017

7-24

City of Morgan Hill

Water System Master Plan

7.8.3

Holiday Pressure Zones

This section documents pipeline improvements within the Holiday Pressure Zone.

HL-P1:

Construct a new 16-inch pipeline in Dunne Avenue between Flaming Oak Lane

and Proposed East Dunne Tank.

HL-P2:

Construct a new 12-inch pipeline in Dunne Avenue between Proposed East Dunne

Tank and Flaming Oak Lane.

HL-P3:

Construct a new 12-inch pipeline in Dunne Avenue between Proposed Holiday 1

Pressure Zone and Oak Leaf Drive.

HL-P4:

Construct a new 12-inch pipeline in Oak Leaf Drive between Dunne Avenue and

650 feet west of Lori Drive.

HL-P5:

Replace existing 8-inch pipeline with a new 12-inch pipeline in Lake View Drive

between Oak Leaf Drive and Holiday Lake Tanks.

7.9 PIPELINE REPAIR AND REPLACEMENT

During the preparation of this master plan, City staff identified sections of pipeline intended to be

replaced due to either deteriorated condition or for operational considerations (

Table 7.10

). It

should be noted that, for planning purposes, the operational improvements generally involve

replacing deficient pipes in kind. However, if feasible and based on site-specific constraints, it is

recommended that 6-inch pipes be upsized to 8-inches. The operational improvements are

summarized below:

RP-1:

Replace existing 6-inch pipeline with a new 6-inch pipeline in Shady Lane between

Holiday Drive and Holiday Drive.

RP-2

: Replace existing 8-inch pipeline with a new 8-inch pipeline in Hill Top Court between

Jackson Oaks Drive and approximately 550 feet northeast of Jackson Oaks Drive.

RP-3:

Replace existing 8-inch pipeline with a new 8-inch pipeline in Oak View Court

between Jackson Oaks Drive and approximately 700 feet northeast of Jackson Oaks

Drive.

RP-4:

Replace existing 8-inch pipeline with a new 8-inch pipeline on the Holiday Tank site

between the existing Holiday Lake tanks and Manzanita Drive.

RP-5:

Replace existing 6-inch pipeline with a new 6-inch pipeline in Manzanita Drive

between Holiday Drive and the end of Manzanita Drive.

RP-6:

Replace the existing 6-inch pipeline with a new 6-inch pipeline in Raccoon Court

between Holiday Court and the end of Raccoon Court.