June 2017
7-24
City of Morgan Hill
Water System Master Plan
7.8.3
Holiday Pressure Zones
This section documents pipeline improvements within the Holiday Pressure Zone.
HL-P1:
Construct a new 16-inch pipeline in Dunne Avenue between Flaming Oak Lane
and Proposed East Dunne Tank.
HL-P2:
Construct a new 12-inch pipeline in Dunne Avenue between Proposed East Dunne
Tank and Flaming Oak Lane.
HL-P3:
Construct a new 12-inch pipeline in Dunne Avenue between Proposed Holiday 1
Pressure Zone and Oak Leaf Drive.
HL-P4:
Construct a new 12-inch pipeline in Oak Leaf Drive between Dunne Avenue and
650 feet west of Lori Drive.
HL-P5:
Replace existing 8-inch pipeline with a new 12-inch pipeline in Lake View Drive
between Oak Leaf Drive and Holiday Lake Tanks.
7.9 PIPELINE REPAIR AND REPLACEMENT
During the preparation of this master plan, City staff identified sections of pipeline intended to be
replaced due to either deteriorated condition or for operational considerations (
Table 7.10
). It
should be noted that, for planning purposes, the operational improvements generally involve
replacing deficient pipes in kind. However, if feasible and based on site-specific constraints, it is
recommended that 6-inch pipes be upsized to 8-inches. The operational improvements are
summarized below:
RP-1:
Replace existing 6-inch pipeline with a new 6-inch pipeline in Shady Lane between
Holiday Drive and Holiday Drive.
RP-2
: Replace existing 8-inch pipeline with a new 8-inch pipeline in Hill Top Court between
Jackson Oaks Drive and approximately 550 feet northeast of Jackson Oaks Drive.
RP-3:
Replace existing 8-inch pipeline with a new 8-inch pipeline in Oak View Court
between Jackson Oaks Drive and approximately 700 feet northeast of Jackson Oaks
Drive.
RP-4:
Replace existing 8-inch pipeline with a new 8-inch pipeline on the Holiday Tank site
between the existing Holiday Lake tanks and Manzanita Drive.
RP-5:
Replace existing 6-inch pipeline with a new 6-inch pipeline in Manzanita Drive
between Holiday Drive and the end of Manzanita Drive.
RP-6:
Replace the existing 6-inch pipeline with a new 6-inch pipeline in Raccoon Court
between Holiday Court and the end of Raccoon Court.