Previous Page  137 / 201 Next Page
Information
Show Menu
Previous Page 137 / 201 Next Page
Page Background

Table 7.9 Schedule of Improvements

Water System Master Plan

City of Morgan Hill

PRELIMINARY

Pipeline Improvements

New/Parallel

/Replace

Diam.

Length

(in)

(in)

(ft)

Improv. No.

Existing

Diameter

Limits

Alignment

Pressure Zone

WD-T1

Woodland Demolish existing 0.03 MG Woodland tank and replace with 0.25 MG tank

New

0.25

HL-T1

Holiday 1

Dunne Ave approx 500' ne/o Flaming Oak Ln

New

0.85

Groundwater Well Improvements

Proposed Pumping Capacity

(gpm)

BR-W1

Boys Ranch

Burnett Ave Approx 6,000' ne/o Monterey Ave

New

800

NH-W2

Nob Hill

Butterfield Blvd 400' E of Railroad Ave and Fisher Ave

New

800

Pump Station Improvements

Proposed Capacity

(gpm)

NH-PS1

Nob Hill

Dunne Ave and Magnolia Wy

New

3 @ 900 gpm

HL-PS1

Holiday 1

Dunne Ave approx 500' ne/o Flaming Oak Ln

New

4 @ 550 gpm

Pressure Reducing Valve Improvements

Proposed Size

(in)

HL-PRV1

Holiday 1

Thomas Gr approx 1,100' w/o Gnarled Oak Ln

New

3

2/16/2017