Table 7.9 Schedule of Improvements
Water System Master Plan
City of Morgan Hill
PRELIMINARY
Pipeline Improvements
New/Parallel
/Replace
Diam.
Length
(in)
(in)
(ft)
Improv. No.
Existing
Diameter
Limits
Alignment
Pressure Zone
WD-T1
Woodland Demolish existing 0.03 MG Woodland tank and replace with 0.25 MG tank
New
0.25
HL-T1
Holiday 1
Dunne Ave approx 500' ne/o Flaming Oak Ln
New
0.85
Groundwater Well Improvements
Proposed Pumping Capacity
(gpm)
BR-W1
Boys Ranch
Burnett Ave Approx 6,000' ne/o Monterey Ave
New
800
NH-W2
Nob Hill
Butterfield Blvd 400' E of Railroad Ave and Fisher Ave
New
800
Pump Station Improvements
Proposed Capacity
(gpm)
NH-PS1
Nob Hill
Dunne Ave and Magnolia Wy
New
3 @ 900 gpm
HL-PS1
Holiday 1
Dunne Ave approx 500' ne/o Flaming Oak Ln
New
4 @ 550 gpm
Pressure Reducing Valve Improvements
Proposed Size
(in)
HL-PRV1
Holiday 1
Thomas Gr approx 1,100' w/o Gnarled Oak Ln
New
3
2/16/2017