Table 7.10 Pipeline Repair and Replacement
Water System Master Plan
City of Morgan Hill
PRELIMINARY
Pipeline Improvements
New/Parallel/
Replace
Diam.
2
Length
(in)
(in)
(ft)
RP-1
Holiday Lake
Shady Ln
From Holiday Dr to Holiday Dr
6
Replace
6
2,550
RP-2
Jackson Oaks
Hill Top Ct
From Jackson Oaks Dr to approx 550' ne/o
Jackson Oaks Dr
8
Replace
8
550
RP-3
Jackson Oaks
Oak View Ct
From Jackson Oaks Dr to approx 700' s/o
Jackson Oaks Dr
8
Replace
8
700
RP-4
Holiday Lake
Holiday Tank Site From Holiday Lake Tanks to Manzanita Dr
8
Replace
8
800
RP-5
Holiday Lake
Manzanita Dr
From Holiday Dr to end of Manzanita Dr
6
Replace
6
1,650
RP-6
Holiday Lake
Raccoon Ct
From Holiday Ct to end of Manzanita Dr
6
Replace
6
1,700
RP-7
Nob Hill
First St
From Monterey Rd to Depot St
6
Replace
6
600
RP-8
Hydropneumatic
Zone
Oak Canyon Dr
From Jackson Oaks Hydropneumatic tank to
Jackson Oaks Dr
8
Replace
8
600
Note:
1. Planned operational improvements include pipelines requiring replacement due to deteriorated condition or other operational issue, as identified by City staff.
2. Where feasible, it is recommended that 6-inch pipelines be upsized to 8-inch pipelines.
2/15/2017
Improv. No.
Pressure Zone
Alignment
Limits
Existing
Diameter